Older colonials hide a few surprises under the shingles. Here's what usually turns up on these roofs and how it affects the plan and the price.

Short answer: Expect more than one layer of old shingles, wooden plank boards instead of plywood under them, a steeper pitch than newer homes and at least one brick chimney that needs new flashing. A good quote plans for all of that up front, including a price for new plywood over the planks if they're in poor shape.

The streets in the old center of town have some of the oldest houses in West Caldwell, many from the 1910s through the 1930s. They're solid houses with good bones. Their roofs, though, have usually been through three or four replacements, and each crew left something behind. Here's what we typically find when we strip one down.

Layers on top of layers

Before the 1990s, it was common to nail a new layer of shingles straight over the old one. Plenty of older colonials in town have two layers, and now and then we find three, with an old wood shingle roof at the very bottom.

All of it has to come off. Extra layers add weight, hide rot and keep the new shingles from lying flat. Removal takes more labor and more dumpster space, so a two-layer roof costs more to replace than a one-layer roof of the same size. If you aren't sure how many you have, look at the edge of the roof at the gutter line. A thick, stepped edge usually means more than one.

Plank decking

Houses from that era were sheathed with boards, often 1×6 or 1×8 planks, rather than sheets of plywood. The boards are usually old-growth wood and can be in surprisingly good shape. The problem is the gaps between them, which were left so the wood shingles of the day could breathe.

Modern asphalt shingles need a continuous, solid surface. Nails that land in a gap don't hold, and shingles over a wide gap can sag or crack. Most manufacturers won't back their warranty on a roof laid over gapped boards.

Old wooden plank roof decking exposed after the shingles were removed
Plank decking exposed during a tear-off. The gaps between boards are why new plywood is often added.

There are two ways to handle it. If the planks are tight and sound, we replace individual bad boards and go ahead. If they're gapped, cupped or soft in places, the better fix is new plywood or OSB nailed over the whole deck. That's called re-sheathing, and it's the single biggest variable on an older roof. Your quote should show it as its own line, either as a full price or a per-sheet price, so it isn't a surprise on the day.

Steep pitch and tall walls

Older colonials tend to have steeper roofs than the ranches and split-levels built later. Steep slopes shed water and snow well, which is good for the shingles. They're also harder and slower to work on. The crew needs roof jacks and planks to stand on, the safety setup takes longer and every bundle has to be carried higher. That's why steep roofs cost more per square foot, and why the price calculator asks about pitch.

The brick chimney

Almost every pre-war colonial in town has a brick chimney, and many have had their flashing covered in tar more times than anyone can count. A new roof is the right moment to redo it properly: step flashing woven in with the new shingles, counter-flashing cut into the mortar joints and, on wider chimneys, a small cricket behind it so water doesn't pool on the uphill side.

It's also worth asking whether the chimney is still used. If the furnace now vents out a side wall and you don't use the fireplace, removing the chimney below the roofline gets rid of one of the most common leak points. Our chimney repair page covers the options.

Ventilation that was never there

Many older attics were built with little or no venting. Some have a pair of small gable vents and nothing else. Without airflow, attic heat bakes the shingles from underneath in summer and moisture condenses on the boards in winter.

A re-roof is the cheapest time to fix that. A continuous ridge vent along the peak, paired with intake at the eaves where the overhang allows it, lets the attic breathe and helps the new roof reach its full lifespan.

What to ask before you sign

  • Will all existing layers be removed down to the deck?
  • How will you handle the plank boards, and what does new sheathing cost?
  • Is chimney flashing new, or are you reusing or sealing the old?
  • Where is ice and water shield going, and how far up from the eaves?
  • What ventilation is included?

Any roofer working on these houses should be able to answer each of these without hesitating. If you'd like us to look at yours, request a free inspection, or get a rough number from the roof price calculator first.